Portfolio
ACONS has proposed the semi-top-down methodology combined with the buttress diaphragm wall to eliminate the defection of the diaphragm wall during excavation to satisfy the stringent requirements of the MRT tunnel structure to less than 20mm defection in each direction.
![](https://acons.com/wp-content/uploads/2023/06/portfolio-cell2.png)
PHOTO © RICONS COMPANY.
![](https://acons.com/wp-content/uploads/2023/06/portfolio-cell1.png)
PHOTO © ACONS COMPANY.
![](https://acons.com/wp-content/uploads/2023/06/portfolio-cell-full.png)
PHOTO © THE FIVE & PARTNERS.
Featured Projects
The new Hotel Building is designed and constructed on the existing piling system, pile-caps, and basements.
![](https://acons.com/wp-content/uploads/2023/06/portfolio-cell-full-the-song.png)
PHOTO © NEWTECONS.
![](https://acons.com/wp-content/uploads/2023/06/portfolio-cell2-the-song.png)
PHOTO © ACONS COMPANY.
![](https://acons.com/wp-content/uploads/2023/06/portfolio-cell1-the-song.png)
PHOTO © NEWTECONS COMPANY.